As the subject says, I need as much performance as I can get from my $20,000 - $25,000 AU budget.
What’s going to give me the most performance for my money?
I’d obviously like 64-bit capability in order to run Max 9 64 and VRay 64.
Said render node(s) will only be used for rendering. I’ll install Windows, Max and VRay then put them in the server room where they shall sit until they die.
With the price drops on x2’s these may be the way to go for now. You’d end up with more boxes though. I’m not sure about rackmount enclosures, but you could probably build 4600x2 with regular cases for about $1000US. Each 4600 will get you about 2/3 the speed of the dual 270’s and you’d end up with probably 2-3 times the number of boxes. This would mean the x2 farm would have about 50-75% more horsepower. It is alot more boxes to setup and/or administer though.
Good idea.
I’ll cost up some X2 nodes and post back.
The potential power bill from so many boxes (20?) would be a bit of a worry though.
How much would be lost from the network traffic?
A few issues I can see are
- Windows’ connection limit. Can this be boosted, or will my workstation require a server OS?
- Will require 2 VRay licenses. Only have one at the moment, but we will be getting another one shortly down the track.
hey DJ,
I would go with the x2’s without the rack mount, it will save a fair chunk o change. Im not sure when the price drop will come into effect though.
I don’t think you’d see any problems with network traffic. Setup a gigabit switch and forget about it. You could setup the whole thing for less than $200-300 probably.
Not sure about the Windows connection limit but this has been a problem for some people. You mentioned the render nodes would be going in the server room-is the server where the nodes would get the files and license from? Is this an actual server with a server OS? If yes to both you don’t need a server OS on your workstation.
I think you’d only need two licenses to do DR on the addtional nodes. Backburner will use all of them I think :? (anyone?).
The need to DR on all of the machines would probably arise quite frequently.
The same machine with 4600+ will cost $1,512.50inc tax, which is $162.50 more per box. On a $20,000 budget I can get 13 boxes, which is 62.4GHz in total - 6.4GHz more than the 3800+ and 14 boxes.
Very fancy
I think this will be a go-er once I’ve confirmed I can remove the 10 connection limit on XP.
:lol: Yeah kind of funny and not truly indicative of the performance level; you can’t just add everything up and see how they compare like that but since that’s what DJ was after I went along with it. Regardless, 13 of the 4200’s would probably be acbout 60-70% faster than the dual 270 boxes and quite a nice render farm.
4400’s are faster than 4200’s but only by a tiny margin.
The cornell BT i was getting a difference of about 2 secs, both boxes had the same MB, ram, HHD, etc.