Heck, even the small jobs take a tone of work, so it’s all relative. A lot of the times the CAD files I get don’t even work, so how do we get paid for figuring out their CAD files? I just did an apartment building and the building couldn’t be built with the drawings I was given, yet I have to spend the time to make it work. These big houses have a lot of large flat surfaces, with stone and roofs that can’t show tiling. Large areas of grass and trees… a ton of work. If everything went smoothly, maybe the number was too high, but in my experience, things rarely go as planned. Seeing something already built doesn’t explain the work it took to get there. To say that this house is just some boxes with some sweeps is misleading. Taking a set of 2D drawings and building a 3D model is not easy.