hello,
I have a file with 300 frame animation, but when opening in Vantage the scene animation is set to 6 seconds (180 frames). how can I increase that?
Was the scene exported with more than 6 seconds of animation? Is it 10 seconds at 30 fps for a total of 300 frames? And you just opened the vrscene file after exporting it from 3dsmax, right?
hello npg
I found the issue. I think its a bug in the vantage
I use a scene with 6-second animation and open in vantage and do some works, then I came back to 3dsmax and edit some materials and scene animation from 6 seconds to 10 seconds and override the vrscene file.in vantage I reload the scene, every change was updated but the scene animation wasn’t.
I see. The .vantage file holds the length of the animation track and this value does not update if the vrscene file changes. We’ll see what we can do about that…
As a workaround you can open the .vantage file with a text editor and find the text that looks like this:
"track_items": [{
"type": "scene",
"duration": 6.0,
and simply change the value to 10. You’ll have to reload of course.
