Some Gaussian Splats issues

Hello again,

I have a couple of issues regarding the Gaussian Splats in Vray:

1. When copy an VrayGaussianGeom, the viewport parameter is reseting back to 100%. Hopefully this can be fixed so that if I change this parameter to for example 10%, the copied version will also have this setting. I tried to tweak this parameter using MAXScript, but apparently this will not show up so that I can batch change all the copied splats.
2. When copy an VrayGaussianGeom, the splat will disappear. When opening the Max file again the splat will be visible.
3. When rendering the splats in 3D Max directly, the loading of the splats will be done one time. But when rendering using Deadline, every frame will load all the splats. At this moment I use a lot of small splats. Therefore the loading time is pretty long. Is this an known issue or do I need to do something during the Deadline submission process?

You need to *instance (*Edit > Clone > Instance) the VRayGaussianGeom object for that to work, not copy.

Otherwise, you can tweak it with MaxScript like so:
for each in objects where classof each == VRayGaussiansGeom do each.viewportPrimitivesPercent = XX

This indeed happens when copying. Reloading the .ply files resolves it, but I’ll make a note of it. Instancing doesn’t have this issue.

This is a known thing, and it happens in 3ds Max, too. Currently, static VRayGaussianSplats are loaded on every frame. We have already logged an improvement request (internal tracker ID: VMAX-15204) to load splats once when static. I’ll add a bump on your behalf.

EDIT: Logged an issue for the broken copy (internal tracker ID: VMAX-15262).

Thank you so much for the answers! I was wondering would the “static VRayGaussianSplats are loaded on every frame if rendered with Deadline” issue be fixed in the next version?

This is planned for Update 3. Which is at the beginning of the next year. However, a stable build could appear a lot sooner, but not before the next hotfix in December.

The devs now told me that GaussianSplats are ALREADY loaded once per frame. I tried it again, and although (I got confused the first time), there’s a message saying "Updating object VRayGaussiansSplat001, etc. on every frame, there is no loading time. It’s best visible in STD, where it is clear as day in the log that the Splats are loaded only for the first frame.

I initially thought this might be the reason for the Deadline problem, too, ̶b̶u̶t̶ ̶I̶ ̶c̶a̶n̶’̶t̶ ̶s̶e̶e̶m̶ ̶t̶o̶ ̶r̶e̶p̶r̶o̶d̶u̶c̶e̶ ̶i̶t̶ ̶t̶h̶e̶r̶e̶ ̶e̶i̶t̶h̶e̶r̶. What kind of job are you submitting (3ds Max or VRScene)? I have a feeling you’ve sent a VRScene job, with a .vrscene export for every frame, in which case loading on every frame is expected.

EDIT: I think I reproduced it (based on what I see in the logs), with a 3ds Max Submission directly in 3ds Max. It seems like it resubmits the frame for each frame. In the integrated submitter, there’s an option under Render > 3ds Max Rendering to “Restart Renderer Between Frames” (check screenshot), which is on by default. It should be off to avoid reloading the splats. I think this is the culprit. Please, try it out.