Normally when I’m using Slate Material editor while IPR is running, wiring nodes update instantly in the mat. editor. However, the node wires of materials plugged in or unplugged from Multi/Sub-Object materials don’t update while IPR is running. So for example if you’ve got a certain material plugged in Multi/Sub-Object and I unplug it while IPR is running, the IPR refreshes to show this change in the render but the wire still stays plugged in the Multi/Sub-Object material despite that it has been unplugged. Even after stopping IPR the wires’ connection don’t update. I hope this makes sense. If not, I can record a video.
We’ve notified the developers about the issue.
Thanks for the report.
You’re welcome! I think this problem might be linked to the other one I reported a month ago where running IPR and adjusting materials in the editor didn’t update the map and material previews - http://forums.chaosgroup.com/showthread.php?91398-Vray-3-5-Beta-Materials-in-Material-Editor-don-t-update-while-IPR-is-running
Not sure if they’re connected, but I could reproduce this one too and have made a note about it.
Thanks again.