Announcement

Collapse
No announcement yet.

Main PC in a 2 PC network (both PCs identical) renders very slowly using Deadline.

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Main PC in a 2 PC network (both PCs identical) renders very slowly using Deadline.

    I've posted this on the Deadline forums as I believe it's a Deadline issue but I thought I'd try here too

    I have a problem with my 2 PC network (both PCs are identical) - when I submit a 600 frame animation render.

    When I submit it via Deadline, the *main* PC renders the frames a LOT slower than the identical slave.

    I know for a fact the each frame should take around 40 seconds. But when I submit via Deadline, the Slave machine renders at that speed, whilst the *main* PC suddenly takes well over a minute.

    If I render on just the main PC and not via Deadline, the frames get rendered in the expected time of 40 seconds per frame.

    It's as though somewhere in Deadline, the PC from which you submit the job is given some sort of lower priority or 'affinity' (I think it's called) - as though it knows it's going to be used on other tasks so isn't taking 100% of the CPUs.

    Any ideas ?

    Thanks in advance.
    Jez

    ------------------------------------
    3DS Max 2023.3.4 | V-Ray 6.10.08 | Phoenix FD 4.40.00 | PD Player 64 1.0.7.32 | Forest Pack Pro 8.2.2 | RailClone 6.1.3
    Windows 11 Pro 22H2 | NVidia Drivers 535.98 (Game Drivers)

    Asus X299 Sage (Bios 4001), i9-7980xe, 128Gb, 1TB m.2 OS, 2 x NVidia RTX 3090 FE
    ---- Updated 06/09/23 -------

  • #2
    I am noticing something similar on my end. If I render the sequence locally, within Maya, each frame takes about 5 minutes. When rendering via Deadline, the worker takes closer to 12 minutes. The light cache phase is fine, but bucket phase takes at least twice as long. CPU affinity it could be...?

    Comment

    Working...
    X