Hi guys,
I have a job I am quoting for. The biggest problem of all is finding a render farm with reasonable pricing.
I basically have an animation that is going to last between 10 & 15 minutes. From my calculations this equates to 18000 frames.
When I use an estimator on a renderfarm site I assume a frame will take an hour (I think possibly more as it needs to be rendered to HD). I also input that I use 4 cpu cores. I then say the total frames are 18000 and then the cost comes out at a rediculous price. The UK site I tried came in at around 45k !!
Am I calculating something wrong ?
Another point is that I need a farm that supports 64 bit max 2009 with the latest vray.
Any links, tips or help is really appreciated.
Ta
I have a job I am quoting for. The biggest problem of all is finding a render farm with reasonable pricing.
I basically have an animation that is going to last between 10 & 15 minutes. From my calculations this equates to 18000 frames.
When I use an estimator on a renderfarm site I assume a frame will take an hour (I think possibly more as it needs to be rendered to HD). I also input that I use 4 cpu cores. I then say the total frames are 18000 and then the cost comes out at a rediculous price. The UK site I tried came in at around 45k !!
Am I calculating something wrong ?
Another point is that I need a farm that supports 64 bit max 2009 with the latest vray.
Any links, tips or help is really appreciated.
Ta
Comment